| Turn fan blades Clearing before and after 2/27/07 Clearing 2/27/07 Finiished clearing 2/28/07 3/1 Went and looked at a job, went to contractors breakfast, and moved equipment. Here's a link to a previous web page I made. I built all the ponds, watersheds and wetlands pictured. Pictures of things I have built. 3/2/07 Starting a New Pond Stipping with dozer. (Machine video) Back to it on monday. 3/4/07 Going to quarry for a few days after monday. I go here tuesday. Dug core on pond. 3/5/07 Core west side. Core east side 3/6/07 Worked on a layer of cap rock at the quarry loading it onto his trucks. It makes good rip-rap. It went from a nice layer to more of a hard crust that won't come loose. They decided to shoot (blast) the rest of the cap rock. Side cutters and layer of rock. 3/7/07 Took a couple pics of loading the holes and of the shot. It sure wasn't a nice flat layer all over. 3/8/07 Couple hours at the quarry and finished up on the cap rock. Have a couple of unfinished blade jobs from thanksgiving, first time it's been dry enough so atacked that this aft (used manual receiver, have sent bladepro for service). Back to quarry monday to help get the dirt out. 3/9/07 Field work |
3/10/07 Worked on terraces. Had been to wet since thanksgiving 3/12/07 Dug overburden. On the side were pushing the dirt out of there was to much mud for the dozer to lay back the sides and push out the dirt. So I bring the dirt up out of the bottom and the dozer shoves it off. Also took a picture of the cap rock we hauled off the top. I think some of the pile was there. 3/13 At the quarry. Hope to get done tomorrow 3/14 Got done at quarry. 3/15 Went back to work on pond1. 3/16 pond1 is shy on dirt and long on rock. 3/17 Principal spillway and emergency spillway. 3/18 Trees in my pond for baby bluegill. Got draignage around house 3/19 Check dam elevation in morning. Should be close. Then will topsoil. 3/21 Dam is up. Topsoiled. Was raining. Rip-rapped face of dam with rock out of pond, should look nice when pond fills and washes dirt and mud off of rocks. Was able to do it for several hundred, so seemed well worth it. The bottom is cleaned out clean just getting the 4000 cu. yds needed, so there wasn't any free habitat to leave. 3/24 Went to Texas to see Lad and go to a PondBoss convention. Lad had to get his dozer calibrated, Monty took me to the ranch. The convention was fun too. 3/26 500 yd core, 4500 yd embankment. Smoothed up some, moved dozer, then it rained. |
3/27 Rebuilding another pond. 3/28 Kind of a long video of pond2, was a long day. 3/29 Got to work at dark, was trying to rain. Finished up at noon in the rain. 3/30 No earthmoving. Move dozer to next pond or work on it monday. 4/2 Started pond 3. Moved dozer, stripped topsoil, and got core almost done. 4/3 Finished core on pond 3. Filled core, installed 2" stock pipe. 4/4 Pushed. 4/5 Put in 8" principal spillway pipe. Dug emergency spillway. Pushed. (Switched to 700 kbs for better quality) 4/8 Would like to see what this guy was going to move. 4/9 Pond 3. Went behind the dam and pushed out some rock to rip rap the face with. Pics of pond 3. 4/14 Working on miantenance since finished pond 3. Has been wet. Fixing track adjuster ![]() ![]() on left side, still need to do right side. Also pulled the rod and head on the tilt cylinder, needs a new rod and sealed. 4/14/07 Snow this morning, gone this afternoon. |