6/8 Fixed up this pond and put in an 8" pipe. Forgot to take after pics. . |
6/10 Built a little diversion |
6/11 Got the tire back for the grader. |
6/13 To wet to work. More rain today possible. |
Sept. Repairing terraces. Put a spare on. |
Sept 26 Leveling field. Blade scraper |
Sept 29 Still working on the field. A couple more Blade 2 Blade 3 |
Oct 11 House Demo Had a little scraper trouble. Fixed a pond and added a pipe to it. |
Oct 18 Got the scraper together and did a building pad for a barn, got it done by when I was supposed to. Bladed some terraces, have more to get done. broke a hydraulic hose friday night, got it fixed saturday. |
Moved excavator to a job tuesday the 17th that will be for several weeks. Rain wendesday. Might be monday before get back to work. |
Oct 24 The rain has caused concerns on the job that was going to start, still haven't started. To wet to do terraces. |
Building Pad for a barn that I did a week or 2 ago. Couple of birds at the farm. |
Nov 2 The job was to lower the spillways on both sides of the dam. |
Nov 10 Pit pond. |
||