zhkent.com

Page 94

6/8
Fixed up this pond and put 

in an 8" pipe.
Forgot to take after pics.

.
6/10
Built a little diversion
6/11
Got the tire back for the grader.
6/13

To wet to work.
More rain today possible.
Sept. 
Repairing terraces.
Put a spare on.
Sept 26
Leveling field.
 Blade

scraper
Sept 29
Still working on the field.

A couple more Blade 2
Blade 3
Oct 11
House Demo

Had a little scraper trouble.

Fixed a pond and added a pipe to it.
Oct 18
Got the scraper together and did a building pad for a barn, got it done by when I was supposed to.
Bladed some terraces, have more to get done. broke a hydraulic hose friday night, got it fixed saturday.

Moved excavator to a job tuesday the 17th that will be 
for several weeks.
Rain wendesday.
Might be monday before get back to work.
Oct 24
The rain has caused concerns on the job that was going to start, still haven't started.

To wet to do terraces.


Building Pad for a barn that I did a week or 2 ago.

Couple of birds at the farm.
Nov 2
The job was to lower the spillways on both sides of the dam.
 Nov 10
Pit pond.